ZERO CARBON HOUSING

A VISION FOR A MORE SUSTAINABLE HOUSING TYPOLOGY

WELSH GOVERNMENT ANNOUNCE CLIMATE CHANGE EMERGENCY 2019

“Our sustainable development and environmental legislation is already recognized as world leading and now we must use that legislation to set a new pace of change.”

 

PROSPERITY FOR ALL – A LOW CARBON WALES

“A Low Carbon Wales, which sets out 100 policies and proposals to meet the 2020 carbon emissions targets. The Welsh Government has committed to achieving a carbon neutral public sector by 2030 and to coordinating action to help other areas of the economy to make a decisive shift away from fossil fuels”

 

THE FUTURE GENERATIONS COMMISSIONER FOR WALES - FUTURE GENERATIONS (WALES) ACT 2015

The Environment (Wales) Act 2016 introduces a duty on Welsh Government to develop carbon budgets for Wales, and to reduce emissions by at least 80% by 2050. The Future Generations (WALES) Act 2015 has been the catalyst for higher standards of decarbonisation in Wales 

 

OUR ETHICAL POSITION AS A PRACTICE HAS CHANGED

With the ever growing priority to decarbonise our existing construction industry Lewis Partnership have taken the responsible ethical position in setting out higher standards for both our projects and the works that we engage with, ensuring that carbon emissions consideration on all projects is a focal point in our design approach.

UK ARCHITECTS DECLARE CLIMATE AND BIODIVERSITY EMERGENCY -

We are part of 950+ Architects across the UK Industry to declare this.

 

ADVISING AND CONSIDERING THE IMPACT OF CARBON POSITIVE MATERIALS

Where achievable are we able to replace carbon heavy materials such as Steel and concrete with more sustainable materials such as glu-lam, and SIP panels. - By ensuring that properties meet their designed energy level needs we are able to minimize the impact on the national grid, this in turn helps reduce carbon heavy coal powering stations.

 

AS MUCH SUSTAINABLE TECHNOLOGY AS POSSIBLE

Integration of MVHR, ASHP/GSHP into consideration when designing as a whole system approach

 

RETOFIRST – RETROFITTING CAMPAIGN

Prioritizing retrofitting of existing buildings over their demolition - Almost 80% of housing that will exist in 2050 already exists 

 

DECARBONISATION OF OUR EXISTING HOMES

On Schemes across Carmarthenshire and Pembrokeshire - We have opportunities and a moral responsibility to ensure that new housing meets the highest levels of performance and self-sustainable.

 

REDUCED EMBODIED CARBON TARGETS ON CONSTRUCTION PROJECTS – 

Using sustainable technologies such as Durisol Blocks to construct - This is achievable, items such as Fabric, Heating, Orientation are all under our control.

 

CURRENT BUILDING REGULATIONS ARENT FIT FOR PURPOSE

Constructing multiple homes that barely meet current building regulations standards is no longer acceptable where EPC ratings of E and above are acceptable,

 

  • We (the construction Industry, Clients and professionals) need to be aiming for much higher EPC ratings in construction of new buildings.

 

  • Acknowledging the performance gap (from designed to constructed) that many properties hold